Nuclear I&C Projects

Let’s be clear: the cost of weak V&V execution is not insignificant.

​

Most I&C engineers in nuclear know ins-and-outs of verification and validation (V&V) as required by NRC regulatory guides like 1.168 and 1.171. What many organizations underestimate is the real operational cost of getting it wrong.

​

Poor V&V leads to:

  • Project rework due to early missed defects

  • Review cycles and phase baselines that drag for months

  • Significant technical errors found at the supposed finish line​

​

Much more than a technical issue, it’s a schedule, budget, and credibility issue. IQOVIC works with engineering managers and project leads to eliminate those risks by building a V&V process that’s defensible, efficient, and built to meet regulator expectations — the first time.

 

At IQOVIC, we bring clarity, structure, and defensible rigor to one of the most critical (and often mishandled) parts of a nuclear I&C project. Rather than buying "testing", our clients buy assurance. And they know the difference.

​​

​

Who We Work With

Well... YOU. We partner with organizations that are directly responsible for getting digital I&C systems through their software project lifecycle process and into safe, reliable operation.

​

That includes:

  • Plant Engineering managing I&C system upgrades in-house

  • Vendors and integrators delivering qualified I&C systems

​

If your role includes delivering a working, qualified I&C system that clears NRC expectations without costly rework or project drag, we’re a fit.

Website - Who We Work With.png
Website - Poor V&V.png

The Effects of Poor V&V

Most teams aren’t failing because they don’t understand the procedures. In fact, it's not the teams that are failing. The issue is that the typical V&V approach doesn’t match the complexity of the project from a holistic standpoint.

​

When V&V is treated like a straightforward procedure to run, at the end of the project you run into problems like:

  • Missed requirements that resurface during licensing

  • Test results that don’t robustly prove whether the system can fault

  • Inconsistent traceability that raises questions — and creates delays

  • Systems that "pass" internal testing but fall short under operational scrutiny

​

The root cause is almost always the same: V&V wasn’t structured deeply enough or executed with enough rigor.

​

More documentation won't fix it. IQOVIC does.

Our Service to You

We work within your project lifecycle — helping your team build confidence into their system from the start, and extract defensible evidence at the end.

​

With IQOVIC, you’re not guessing whether you tested enough. 

​

Our services focus on:

  • Identifying errors and ambiguities in requirements and early design before they lead to costly rework

  • Ensuring test cases reflect how the system could fail, not just how it’s supposed to work

  • Tightening traceability so there’s no gap between what was required, what was built, and what was tested

  • Producing evidence structured for regulatory review, not just documentation for the sake of it.

​

We help you eliminate the guesswork, reduce the back-and-forth, and accelerate project closure — without sacrificing quality or safety case integrity.

Website - What We Offer.png

Let's Talk

If you’re starting a new digital upgrade — or you’re already in the middle of one and know the V&V effort isn’t as strong as it needs to be — let’s talk.

​

We’ll walk through your scope, your timeline, and what it’s going to take to get across the finish line with fewer surprises and stronger results.

​

Let’s make V&V a point of strength — not a risk.